Modern Tucson
Urban renewal cleared part of downtown in the 1960s, the barrios south of it held on, and water has been the long argument. This page follows the last six decades.
Eighty acres
On March 1, 1966, Tucson voters approved the Pueblo Center Redevelopment Project, Arizona's first major urban renewal project. It targeted the most densely populated eighty acres in the state. Most residents of the barrios rented, and Arizona law let only property owners vote on the bonds.
Demolition began in May 1967. Over the next two years, 269 structures came down, and official estimates say 735 residents had to leave. The $17.6 million Tucson Community Center, now the Tucson Convention Center, opened on November 6, 1971.
The barrios that stayed
What survived south of the cleared land is Los Barrios Viejos, four neighboring barrios with 622 buildings, structures and sites from 1862 to 1942. A draft National Historic Landmark nomination calls most of the buildings a continuation of the Mexican vernacular tradition known as Sonoran.
Residents also organized to fight off a freeway, the Butterfield Route, that would have destroyed the oldest buildings in Barrio Calle Meyer and Convento. Today, the nomination notes, people who can afford some of the highest real estate prices in the city find living there alluring.
Downtown, rebuilt
In 1999 voters approved the Rio Nuevo district, funded by a share of state sales tax. The Sun Link streetcar followed. It opened in July 2014 and runs 3.9 miles with 23 stops through Mercado San Agustín, downtown, Fourth Avenue and the University of Arizona.
The Convention Center that urban renewal produced was listed on the National Register of Historic Places in 2015. The Downtown Tucson Partnership says plenty of Tucsonans kept believing in the city center through the 1980s and 1990s.
A river that went dry
The Santa Cruz River once ran year-round along nine stretches in the Tucson area, with cottonwood and mesquite along its banks. Overgrazing, groundwater pumping and dams all contributed, and in the mid-20th century the stretch through Tucson dried up completely.
The Central Arizona Project was meant to bring Phoenix and Tucson renewable surface water. Construction began at Lake Havasu in 1973 and finished 20 years later south of Tucson, at a cost of more than $4 billion. Tucson's first taste was rough: river water stirred up rust in water mains and house pipes, and the city paid about $450,000 in damage claims.
The Sun Corridor and what is next
Tucson and Phoenix anchor the Arizona Sun Corridor. Phoenix has kept outpacing Tucson since passing it, but both have had some of the highest growth rates in the country. University of Arizona water researchers note that Tucson's groundwater management area sits on the I-10 and I-19 corridor, where the state's growth is concentrated.
The Colorado River rules behind CAP water are due for a rewrite. The Central Arizona Project says the 2007 shortage-sharing guidelines and the Drought Contingency Plan expire at the end of 2026, that Arizona is working with the other basin states on what comes next, and that the basin is in a Tier 1 shortage for 2026.
- Tucson, Arizona
- History of Tucson, Arizona
- Santa Cruz River (Arizona)
- Central Arizona Project
- Tucson Convention Center
- Los Barrios Viejos National Historic Landmark nomination (draft)
- History of Downtown Tucson
- About
- Tucson Streetcar
- History of Central Arizona Project
- Colorado River Reductions
- Arroyo 2021: Community-Based Solutions to Local Water Challenges in Arizona